- Broschiertes Buch
- Merkliste
- Auf die Merkliste
- Bewerten Bewerten
- Teilen
- Produkt teilen
- Produkterinnerung
- Produkterinnerung
Aimed at civil engineers and quantity surveyors and students of these disciplines in the preparation of bills of quantities.
Andere Kunden interessierten sich auch für
Boris ZalesskijFrom programs to concrete projects40,99 €
Toshio YamadaContemporary Capitalism and Civil Society91,99 €
Toshio YamadaContemporary Capitalism and Civil Society91,99 €
Toshio YamadaCivil Society and Social Science in Yoshihiko Uchida76,99 €
Toshio YamadaCivil Society and Social Science in Yoshihiko Uchida76,99 €
Faustin BulamboOn the banking of civil servants' salaries27,99 €
George StephensonEstimating a Method of Pricing Builders' Quantities for Competitive Work29,99 €-
-
-
Aimed at civil engineers and quantity surveyors and students of these disciplines in the preparation of bills of quantities.
Produktdetails
- Produktdetails
- Verlag: Macmillan Education UK / Red Globe Press / Springer, Berlin
- Artikelnr. des Verlages: 978-0-333-80074-4
- 6. Aufl.
- Seitenzahl: 308
- Erscheinungstermin: 24. Juli 2017
- Englisch
- Abmessung: 246mm x 189mm x 17mm
- Gewicht: 605g
- ISBN-13: 9780333800744
- ISBN-10: 0333800745
- Artikelnr.: 24459879
- Herstellerkennzeichnung
- Libri GmbH
- Europaallee 1
- 36244 Bad Hersfeld
- gpsr@libri.de
- Verlag: Macmillan Education UK / Red Globe Press / Springer, Berlin
- Artikelnr. des Verlages: 978-0-333-80074-4
- 6. Aufl.
- Seitenzahl: 308
- Erscheinungstermin: 24. Juli 2017
- Englisch
- Abmessung: 246mm x 189mm x 17mm
- Gewicht: 605g
- ISBN-13: 9780333800744
- ISBN-10: 0333800745
- Artikelnr.: 24459879
- Herstellerkennzeichnung
- Libri GmbH
- Europaallee 1
- 36244 Bad Hersfeld
- gpsr@libri.de
Ivor H. Seeley, George Murray
PART 1: MEASUREMENT THEORY AND PRACTICE.- Scope and Context of Civil Engineering Work Measurement.- Fundamental Principles of CESSM 3.- Measurement Practice and Bill Production.- CESMM 3: Classes A-D: Contract and Preparatory Site Matters.- CESMM 3: Class E: Excavation, Filling and Landscaping.- CESMM 3: Classes F-H: Concrete.- CESMM 3: Classes I-L: Pipework.- CESMM 3: Classes M-O: Metalwork and Timber.- CESMM 3: Classes P & Q: Piling.- CESMM 3: Classes R-T: Roads, Rails and Tunnels.- CESMM 3: Classes U-W: Walling, Painting and Waterproofing.- CESMM 3: Classes X-Z: Miscellaneous, Renovation and Incidental Works.- PART 2: WORKED EXAMPLES.- Demolition and Site Clearance.- Excavation and Filling.- Mass Concrete Retaining Wall.- Precast Prestressed Concrete Beams.- Pumping Chamber.- Sewage Holding Tank.- Pumphouse.- Stone Faced Sea Wall.- Sewer.- Water Main.- Steel-Framed Gantry.- Timber Jetty.- Hybrid Piles.- Quay with Concrete and Timber Piles.- Steel Sheet Piling.- Navigation Lamp Platform.- Estate Road.- Rail Track.- Tunnel.- Sewer Renovation.- Water Main Renovation.
PART 1: MEASUREMENT THEORY AND PRACTICE.- Scope and Context of Civil Engineering Work Measurement.- Fundamental Principles of CESSM 3.- Measurement Practice and Bill Production.- CESMM 3: Classes A-D: Contract and Preparatory Site Matters.- CESMM 3: Class E: Excavation, Filling and Landscaping.- CESMM 3: Classes F-H: Concrete.- CESMM 3: Classes I-L: Pipework.- CESMM 3: Classes M-O: Metalwork and Timber.- CESMM 3: Classes P & Q: Piling.- CESMM 3: Classes R-T: Roads, Rails and Tunnels.- CESMM 3: Classes U-W: Walling, Painting and Waterproofing.- CESMM 3: Classes X-Z: Miscellaneous, Renovation and Incidental Works.- PART 2: WORKED EXAMPLES.- Demolition and Site Clearance.- Excavation and Filling.- Mass Concrete Retaining Wall.- Precast Prestressed Concrete Beams.- Pumping Chamber.- Sewage Holding Tank.- Pumphouse.- Stone Faced Sea Wall.- Sewer.- Water Main.- Steel-Framed Gantry.- Timber Jetty.- Hybrid Piles.- Quay with Concrete and Timber Piles.- Steel Sheet Piling.- Navigation Lamp Platform.- Estate Road.- Rail Track.- Tunnel.- Sewer Renovation.- Water Main Renovation.







