29,99 €
inkl. MwSt.
Versandkostenfrei*
Versandfertig in 6-10 Tagen
payback
15 °P sammeln
  • Broschiertes Buch

This book consists of a brief background for the electric chiller, Energy Storage (ES), Thermal energy storage (TES) system, and life cycle cost (LCC) analysis. The problem statement has been stated to describe the reason after highlighting the research gaps and the objectives have been listed to focus on the target and outcomes expected from this research. a probabilistic LCC has been employed to investigate the performance of TSS being constituted by multiple electric chillers and TES tanks located at the GDC plant, UTP. The mathematical tool MATLAB was used to aid the calculations.

Produktbeschreibung
This book consists of a brief background for the electric chiller, Energy Storage (ES), Thermal energy storage (TES) system, and life cycle cost (LCC) analysis. The problem statement has been stated to describe the reason after highlighting the research gaps and the objectives have been listed to focus on the target and outcomes expected from this research. a probabilistic LCC has been employed to investigate the performance of TSS being constituted by multiple electric chillers and TES tanks located at the GDC plant, UTP. The mathematical tool MATLAB was used to aid the calculations.
Autorenporträt
L'Ing. Ali Akbar è professore assistente presso il Dipartimento di Ingegneria Industriale e Management della Dawood University of Engineering and Technology, Karachi, Pakistan. È entrato a far parte della Dawood Engineering University nel 2012. Ha completato il suo MSc. Meccanica presso la Universiti Teknologi PETRONAS Malaysia nel 2019.